Further work on the frame, as those particular holes at the main support has been relocated at a bit lower position, I have to work that out with the electric drill again. Further surface work has been done before the frame was primed with #1200 surfacer.
The rear swingarm was adjusted a little bit on its width so the resulting frame was able to hold the rear cowling much better.
A Roundup of 2024
1 week ago
No comments:
Post a Comment